Basic Info.
Model NO.
22
Thread Type
Internal Thread
Material
Carbon Steel
Type
Three-Way
Application
Hydraulic/Gas/Water
Transport Package
Plastic Packaging Box and Pallet
Trademark
YC-LOK
Origin
China
HS Code
7307290000
Production Capacity
100000CS/One Month
Product Description
1. Products Info
1.Working pressure: up to 9000 psi
2.Working temperature:-20 to 200 Celsius Degree
3.Size: 1/8" to 1 1/2" (Fractional Tube) or 2 to 38 mm (Metric Tube)
4.Diverse materials and configurations are available.
5.Precision machined components ensure perfect deformation of the ferrules and tubing.
6.Hardened threads and smoothed surface finishes extend fitting life and prevent sticking of the matching threads.
7.Radius junction design with elbows provides smooth flow path.
8.Every fitting is stamped with size, material, and heat code
9.Fittings are easy to disconnect and retighten
2. Pics for reference
3. Company Profile
YC-LOK is the leader in the field of flow control technology manufacturers.
Our goal is beyond technical boundaries, the industry leader.
Since its inception, we have developed a research direction and developed precision valves, regulators, fluid connections and high-tech flow control systems.
4. Packing and Delivery
Packing
@ As per customer's specified requirements
@ Standard Export Packing:Carton+Pallet
Shipping
@ Small order: By express, TNT/ DHL/ UPS/ Fedex etc.
@ Large order: By sea or By air
@ Choose the best suitable way as your need.
5.RFQ
1. What is the acceptable MOQ?
For this,our acceptable MOQ is 10 pcs.
2. What is the Delivery time?
For samples,we usually have them in stock, so the delivery time will be quite short .
For normal order, the delivery time should be in 2 weeks.
3.What is the acceptable payment term?
Trade Assurance ,T/T, Western union, MoneyGram.
1.Working pressure: up to 9000 psi
2.Working temperature:-20 to 200 Celsius Degree
3.Size: 1/8" to 1 1/2" (Fractional Tube) or 2 to 38 mm (Metric Tube)
4.Diverse materials and configurations are available.
5.Precision machined components ensure perfect deformation of the ferrules and tubing.
6.Hardened threads and smoothed surface finishes extend fitting life and prevent sticking of the matching threads.
7.Radius junction design with elbows provides smooth flow path.
8.Every fitting is stamped with size, material, and heat code
9.Fittings are easy to disconnect and retighten
Product Name | tube fittings |
Material | Stainless Steel, Carbon Steel |
Body Type | Straight, Elbow, 45 degree, 90 degree |
Brand | YC-LOK, or according to your requirements |
Thread System | Metric,ISO Tapered, NPT, BSPP, BSPT, JIS, SAE,UNF, G, R, JIC |
Connection Surface | Multiseal, Flat, Flat O-Ring, Cone Seat |
Cleaning Process | Standard Cleaning and Packaging |
2. Pics for reference
3. Company Profile
YC-LOK is the leader in the field of flow control technology manufacturers.
Our goal is beyond technical boundaries, the industry leader.
Since its inception, we have developed a research direction and developed precision valves, regulators, fluid connections and high-tech flow control systems.
4. Packing and Delivery
Packing
@ As per customer's specified requirements
@ Standard Export Packing:Carton+Pallet
Shipping
@ Small order: By express, TNT/ DHL/ UPS/ Fedex etc.
@ Large order: By sea or By air
@ Choose the best suitable way as your need.
1.Packaging Details: | 1. Wooden box 2. Carton 3. As your request. |
2.Delivery Detail: | Shipped in 15~30 days after payment |
3.MOQ: | 50 / 100 pcs |
4.Samples: | Free |
5.OEM Accepted | Yes |
6.Production Capacity: | 10,000pcs Per week |
7.Payment Term: | (1) L/C,T/T,D/P,D/A,PAYPAL,WESTERN UNION,MONEY GRAM |
5.RFQ
1. What is the acceptable MOQ?
For this,our acceptable MOQ is 10 pcs.
2. What is the Delivery time?
For samples,we usually have them in stock, so the delivery time will be quite short .
For normal order, the delivery time should be in 2 weeks.
3.What is the acceptable payment term?
Trade Assurance ,T/T, Western union, MoneyGram.